Ezra 6:15
Studied by claude-opus-5-5 Checked against the Aramaic
Aramaic
וְשֵׁיצִיא֙ בַּיְתָ֣ה דְנָ֔ה עַ֛ד י֥וֹם תְּלָתָ֖ה לִירַ֣ח אֲדָ֑ר דִּי־הִ֣יא שְׁנַת־שֵׁ֔ת לְמַלְכ֖וּת דָּרְיָ֥וֶשׁ מַלְכָּֽא׃ פ
wə-šêṣîʾ baytâ dənâ ʿad yôm təlātâ lîraḥ ʾădār dî-hîʾ šənat-šēt lə-malkût dāryāweš malkāʾ
And-was-brought-to-completion the-house this by day three of-month Adar, which it [is] year-of six of-the-reign-of Darius the-king.
Ezra 4:8–6:18 is in Aramaic, the official language of the Persian Empire. It quotes the letters between local officials and the Persian kings about rebuilding Jerusalem, and tells the story around them in the same language. Why Aramaic?
What it meant
"And this house, God's house, was brought through to its completion by the third day of the moon-month Adar, the last month of the year, which was the sixth year of the reign of Darius the king."
The verse is a formal completion notice, written in the style of an official building record. The verb literally means "was brought out", in the sense of "carried through to the end". It is a building-inscription word borrowed from Babylonian. The "house" is the temple, pictured as God's dwelling: the next verse calls it "the house of God." The date uses the empire's own calendar and its own dating formula: the Babylonian month Adar and the regnal year of the Persian king. In our terms this is about early-to-mid March 515 BC (often calculated as 12 March 515).
For the first hearers, the plain wording carried a lot. The temple Babylon burned around 586 BC stood again, roughly seventy years later. The work had stopped and started for almost two decades after Cyrus's decree. Then it was finished in about four and a half years once Haggai and Zechariah stirred the people to resume (Haggai 1:15; Ezra 5:1–2). Darius's own decree guaranteed it and paid for it. The verse also implies something it does not say: the house was finished on the eve of a new year, in time for the community to keep Passover there in the following month (6:19).
What the first hearers heard
For Judeans in Persian Yehud, and for later readers of Ezra–Nehemiah, this verse was the climax of the first half of the book's story. It meant several things:
- The promise kept. Cyrus's decree (1:1–4), the prophets' urging (5:1) and Darius's decree (6:6–12) all end here in a completed house. The previous verse sums it up: they finished "according to the command of the God of Israel and the decrees of Cyrus, Darius, and Artaxerxes" (6:14). Divine command and imperial authorisation come together.
- God's house restored among them. In their world a temple was where a god lived among a people. A restored house meant restored relationship, sacrifice, priesthood and festival life. The narrative moves at once to a joyful dedication (6:16–18) and then to Passover (6:19–22), Israel's founding festival of liberation, kept again in God's house by "those who had returned from exile."
- Life under empire. The date uses a Babylonian month and a Persian king's reign. No Davidic king is mentioned, and Zerubbabel, prominent in Haggai and Zechariah, does not appear at the completion. The community is presented as a worshipping people within the Persian empire, whose security depends on God moving foreign rulers' hearts (6:22).
- Precision as testimony. An exact date anchors the event in public, checkable time, much like a royal archive entry. It fits the book's habit of quoting documents to show the restoration was legitimate and authorised, both before God and before the empire.
Every word
Tap any word for its full meaning and everywhere it appears.
-
וְשֵׁיצִיא֙
wə-šêṣîʾ · H3319
and was finished / brought to completion
This is the 'causative' form of the verb 'go out', which literally means 'make go out' and in practice means 'carry through to the end, complete'. The word came into Aramaic from Akkadian, the language of Babylon. It opens the verse as the closing note of the building story: the work has been brought all the way out to its finish.
-
בַּיְתָ֣ה
baytâ · H1005
the house
'House' is the normal Semitic word for a temple, pictured as the dwelling of the deity. The very next verse calls it 'the house of God'. The '-â' ending works like English 'the': this is the house the whole chapter has been about.
-
דְנָ֔ה
dənâ · H1836
-
עַ֛ד
ʿad · H5705
until, up to, by
Strictly 'up to'. With a verb of completing, it marks the point the work reached its end: 'by' or 'on' the third day. YLT's 'till' keeps the literal shape but makes the sense less clear.
-
י֥וֹם
yôm · H3118
day
A calendar day, used here in a precise date formula.
-
תְּלָתָ֖ה
təlātâ · H8532
three
'Three', meaning the third day of the month. The number has the form Aramaic uses with a masculine noun like 'day'. Another ancient retelling (1 Esdras) reads 'twenty-third' (see textual notes).
-
לִירַ֣ח
lîraḥ · H3393
of the month
Literally 'of the moon', since a month was one cycle of the moon. Yeraḥ is the standard word for 'month' in Aramaic documents of the Persian empire, such as the Jewish papyri from Elephantine in Egypt.
-
אֲדָ֑ר
ʾădār · H144
Adar
Adar is the twelfth and last month of the year (late February to March). The name is Babylonian (Addaru). Jews took over the Babylonian month names during and after the exile, so the name itself marks a post-exilic, Persian-era setting.
-
דִּי־
dî · H1768
which, that
A connecting word ('which') that introduces the year as further detail on the date.
-
הִ֣יא
hîʾ · H1932
it (she)
A pronoun used as 'is': 'which is the year...'. It is feminine because 'year' is feminine.
-
שְׁנַת־
šənat · H8140
year of
'Year of', joined to the number that follows, giving 'year six'. This matches the wording of official Persian-era dating formulas.
-
שֵׁ֔ת
šēt · H8353
six
'Year six' means the sixth regnal year (counted by the king's reign) of Darius I, which corresponds to spring 516 to spring 515 BC.
-
לְמַלְכ֖וּת
lə-malkût · H4437
of the reign / kingship
Malkû can mean the kingdom as a realm, but in date formulas it means the reign as a span of time: 'of the reign of'.
-
דָּרְיָ֥וֶשׁ
dāryāweš · H1868
Darius
Darius I, 'the Great', who reigned 522–486 BC. The name comes from Old Persian Dārayavauš, roughly 'he who holds firm the good'. Elephantine documents spell it in Aramaic as דריוהוש. He is the king whose decree (6:6–12) protected and funded the building.
-
מַלְכָּֽא׃
malkāʾ · H4430
the king
'The king', the usual official title in Aramaic royal dating. The verse dates the temple's completion by a foreign emperor's reign, not by any king of Judah.
Key words, in depth
שֵׁיצִיא šêṣîʾ H3319
- Range of meaning
The verb is the causative ('shaphel') form of the root meaning 'go out', so literally 'cause to go out'. In use it means 'bring to completion, finish, carry through'. It is a loanword from Akkadian šūṣû, which means 'bring out' and also 'complete' a building or task. This verse is its only occurrence in the Bible.
- Against the English
Most English versions read 'finished' or 'completed', which is accurate. YLT's 'hath gone out' renders the root ('go out') but misses that the form means 'complete', so the English becomes almost meaningless. Grammatically the verb is active and singular ('he/it brought to completion'), with 'this house' as its subject. That is why translators render it as a passive ('was finished'), while the ancient Greek and Latin versions turned it into 'they finished'.
- Used elsewhere in the period
Its Akkadian source word is common in Mesopotamian building inscriptions for completing a temple or palace. A companion loanword of the same kind, šêzib ('rescue'), appears in Daniel 3:15–28 and 6:16–27. Both reflect the strong Babylonian influence on Imperial Aramaic (Kaufman, The Akkadian Influences on Aramaic).
- What it does in this verse
The word belongs to the vocabulary of royal building records. Ezra's narrator ends the Aramaic account with the kind of completion notice a Mesopotamian or Persian building inscription would use. The project that stalled for almost twenty years (4:24) is officially recorded as 'brought out to its end'.
בַּיְתָה baytâ H1005
- Range of meaning
A house or dwelling, a household, and above all a temple as a deity's residence. In Ezra's Aramaic section it consistently means the Jerusalem temple: 'the house of God' (5:2, 5:8, 6:3, 6:16), 'the house of the great God' (5:8).
- Against the English
KJV, WEB, YLT and ESV keep 'house'. BSB, NIV and NASB say 'temple'. 'Temple' gives the right referent. 'House' keeps the idea of a dwelling, and the next verse depends on that idea: 'the house of God' is dedicated.
- Used elsewhere in the period
Across the ancient Near East a temple was a god's 'house': Akkadian bītu, Ugaritic bt, Hebrew bayit. In the Elephantine papyri (late 400s BC) the Jewish temple at Yeb is called 'the altar-house of YHW the God' (אגורא זי יהו אלהא, also בית מדבחא).
יְרַח אֲדָר yəraḥ ʾădār H3393; H144
- Range of meaning
Yeraḥ means 'moon' or 'month'. Adar is the name of the twelfth month in the Babylonian calendar (Addaru), which corresponds to about February–March.
- Against the English
All the English versions handle this accurately. NLT converts the date to a modern calendar date with a footnote. That helps readers but removes the Babylonian month name and its meaning.
- Used elsewhere in the period
Babylonian month names (Nisan, Sivan, Elul, Kislev, Adar...) replace Israel's older names and numbered months in post-exilic books: Esther, Nehemiah, Zechariah 1:7 ('the eleventh month, which is the month Shebat'). The Elephantine papyri use ירח plus a Babylonian month name, often alongside an Egyptian date.
- What it does in this verse
The month marks how far Judah's world had changed. The date is given in the empire's calendar. Adar is also the last month of the year, so the house is finished just before the new year in Nisan, and the community keeps Passover in it in the very next month (6:19).
לְמַלְכוּת דָּרְיָוֶשׁ מַלְכָּא lə-malkût dāryāweš malkāʾ H4437; H1868; H4430
- Range of meaning
Malkû means kingship, reign, or kingdom. In a date formula it means a regnal span: 'of the reign of'. Dāryāweš is Darius, here Darius I Hystaspes.
- Against the English
'In the sixth year of the reign of King Darius' is accurate in all major versions. None of them can show that this is the standard official dating formula of the Persian chancery (the royal record office).
- Used elsewhere in the period
Aramaic documents from the Persian period use almost the same formula: 'in year N of Darius the king' (בשנת N לדריוהוש מלכא). Babylonian tablets date the same way (šattu N Dariamuš šar...). Haggai 1:1 and Zechariah 1:1 also date their prophecies by Darius's regnal years.
- What it does in this verse
No king of David's line dates this event. Earlier Israelite history was dated by its own kings (e.g. 1 Kings 6:1, Solomon's fourth year). The restored temple is dated by a Persian emperor's reign. Ezra presents that reign as God's instrument: 'the God of Israel… turned the heart of the king of Assyria [i.e. the imperial ruler] toward them' (6:22). Faithfulness to God goes on inside imperial rule, not outside it.
The world behind it
Persian-era Judah ("Yehud"). In 539 BC Cyrus of Persia took Babylon. His decree (Ezra 1; 6:3–5) allowed exiled Judeans to return and rebuild their temple. Foundations were laid (3:8–13), but local opposition and discouragement stopped the work (4:1–5, 4:24). In 520 BC, Darius I's second year, the prophets Haggai and Zechariah urged the leaders Zerubbabel and Joshua to resume (Haggai 1; Zechariah 4; Ezra 5:1–2). The provincial governor Tattenai asked the court whether the project was authorised. A search of the archives at Ecbatana turned up Cyrus's memorandum. Darius confirmed it and ordered the building funded from royal tax revenue, threatening severe punishment on anyone who interfered (6:1–12).
Why Aramaic? Aramaic was the administrative language of the Persian empire. Ezra 4:8–6:18 quotes official letters and decrees in that language, and the narrator keeps writing in Aramaic through the dedication (6:18). Ezra then switches back to Hebrew for the Passover (6:19). So this completion notice sits in the "official record" part of the book and uses its idiom.
The date. The sixth year of Darius I ran from spring 516 to spring 515 BC. Using the standard Babylonian tables (Parker & Dubberstein), 3 Adar of that year falls in March 515 BC. Building had resumed on 24 Elul (the sixth month) of year 2 (Haggai 1:15), so it took roughly four and a half years. Many interpreters note that 515 is about seventy years after the destruction of 586, the span Zechariah's generation had in mind (Zechariah 1:12; 7:5; compare Jeremiah 25:11–12; 29:10). Ezra itself does not draw that link here.
A modest house. Older people who remembered Solomon's temple wept at the new foundations (3:12). Haggai admitted the new house seemed "as nothing" by comparison (Haggai 2:3), yet promised its glory would be greater (2:9). The dry, precise date notice shows no disappointment. It records that what God commanded and the kings decreed (6:14) was actually done.
How the translations handle it
“And this temple was completed on the third day of the month of Adar, in the sixth year of the reign of King Darius.”
- Gets right
- 'Temple' names the referent plainly for modern readers. Clear and accurate.
- Loses
- 'Temple' loses the link to 'house of God' in the next verse. It also drops the 'which is' clause, a small smoothing.
“And this house was finished on the third day of the month Adar, which was in the sixth year of the reign of Darius the king.”
- Gets right
- Keeps 'house', which preserves the temple-as-dwelling idea that 6:16 ('the house of God') builds on. Keeps the 'which was' clause and the word order 'Darius the king', both close to the Aramaic.
- Loses
- None of substance. 'Finished' turns the singular active Aramaic verb into a passive, as nearly all versions must.
“This house was finished on the third day of the month Adar, which was in the sixth year of the reign of Darius the king.”
- Gets right
- Follows the KJV closely in modern spelling. Keeps 'house'.
- Loses
- Leaves out the opening 'and', which ties this verse to the building narrative in 6:14.
“And this house hath gone out till the third day of the month Adar, that is [in] the sixth year of the reign of Darius the king.”
- Gets right
- Shows the literal root 'go out' and the preposition 'until', so the reader sees the bare Aramaic structure.
- Loses
- 'Hath gone out' misreads the causative form, which means 'complete', and is almost unintelligible in English. 'Till' obscures that this is the completion date.
“…'this house was finished'…”
- Gets right
- Keeps 'house' in a modern, accurate rendering close to the KJV tradition.
“…'The temple was completed'…”
- Gets right
- Clear for modern readers.
- Loses
- Drops 'this', which points back to the specific house named in the royal decrees, and swaps 'house' for 'temple'.
“…'This temple was completed'…”
- Gets right
- Keeps the demonstrative 'this'. Accurate.
- Loses
- 'Temple' for 'house', as in BSB and NIV.
“…Gives a modern calendar date in place of 'the third day of…”
- Gets right
- Readers immediately know when in the year, and in history, this happened.
- Loses
- Removes the Babylonian month name from the main text. The name itself shows Judah's post-exilic, imperial setting. It also presents one calculated equivalent as if it were the text.
Text and manuscripts
The day: third or twenty-third? The Masoretic text (the standard Hebrew-Aramaic text) and the Septuagint of Ezra (Greek 2 Esdras 6:15) read "third day" of Adar. 1 Esdras 7:5, a separate Greek retelling of these events, reads "the twenty-third day of the month Adar," and Josephus (Antiquities 11.107) also gives the twenty-third. Some scholars think "twenty" dropped out of the Masoretic text. Others think 1 Esdras harmonised or corrected the date. Most modern commentaries (e.g. Williamson, Blenkinsopp) keep "third" as the harder-to-explain, well-attested reading while noting the alternative.
The verb. The supplied morphology (perfect, 3rd masculine singular) fits the Masoretic vowels: grammatically "he/it completed", with "this house" in the subject slot. Translators read it as an intransitive or passive "was finished." The Septuagint has the active plural ἐτέλεσαν ("they completed [this house]"), and the Vulgate likewise renders it with a plural, "they completed." These look like translators' smoothings of an unusual Aramaic construction rather than evidence of a different underlying text. Some grammarians suggest repointing to a plural or passive form. The sense is the same either way.
Strong's labelling. The supplied lemma is listed under H3319, Strong's entry for the Aramaic verb yəṣāʾ ("to finish"), which is distinct from Hebrew yāṣāʾ (H3318, "go out"). This is correct. The actual form is the causative stem, borrowed from Akkadian šūṣû.
Date of the completion. The standard reckoning puts Darius I's sixth year at 516/515 BC and 3 Adar in March 515 BC. A minority view (e.g. D. Edelman) argues that the rebuilding really belongs to the reign of Artaxerxes I and that Ezra's chronology is a later construction. See debates.
- 1 Esdras 7:5, the Greek retelling of this story, dates the completion to the twenty-third of Adar, not the third. Josephus (Antiquities 11.107) follows it, while the Hebrew-Aramaic text and the Septuagint of Ezra read 'third'.
Where scholars differ
Was the temple completed on the 3rd or the 23rd of Adar?
-
The 3rd of Adar (Masoretic text) is original.
It is supported by the Masoretic text and the Septuagint of Ezra (2 Esdras). It is the 'harder' reading, because a later scribe is unlikely to have shortened a number. Many commentators think 1 Esdras or its source adjusted the date.
-
The 23rd of Adar (1 Esdras) is original, and 'twenty' fell out of the Masoretic text.
It is supported by 1 Esdras 7:5 and Josephus, *Antiquities* 11.107. Dropping a tens-number is a known kind of scribal accident. Some also suggest calendar reasons for preferring the later day.
Under which Persian king was the second temple actually finished?
-
Under Darius I, in 515 BC, as Ezra states.
Ezra 6:15 is explicit. Haggai and Zechariah date the resumed work to Darius's second year (520 BC). Most historians accept a completion in the late 6th century BC.
-
The rebuilding belongs later, under Artaxerxes I (mid-5th century), and Ezra's chronology is a later literary construction.
Argued by D. Edelman (*The Origins of the 'Second' Temple*, 2005), based on archaeological and administrative reconstructions of Yehud and on Ezra's sometimes non-chronological arrangement (e.g. Artaxerxes named in 4:7–23 and 6:14). It remains a minority position.
Sources
- HALOT (Biblical Aramaic section) s.v. יצא (shaphel שֵׁיצִיא)
- BDB (Aramaic) s.v. יְצָא, בַּיִת, יְרַח
- F. Rosenthal, A Grammar of Biblical Aramaic (shaphel forms and Akkadian loans)
- S. A. Kaufman, The Akkadian Influences on Aramaic (1974), on šêṣîʾ < šūṣû
- R. A. Parker & W. H. Dubberstein, Babylonian Chronology 626 B.C.–A.D. 75
- H. G. M. Williamson, Ezra, Nehemiah (Word Biblical Commentary)
- J. Blenkinsopp, Ezra–Nehemiah (Old Testament Library)
- B. Porten, The Elephantine Papyri in English (Persian-era Aramaic dating formulas)
- 1 Esdras 7:5 (Septuagint)
- Josephus, Antiquities 11.107
- D. Edelman, The Origins of the 'Second' Temple (2005)
- IVP Bible Background Commentary: Old Testament, on Ezra 6
Original-language data: STEPBible TAHOT/TAGNT (CC BY 4.0).
What readers are saying
Loading…